Response within 48 hours +49 176 21612240 info@bat-ausbau.de DE EN
Craftsman levelling fresh screed across a large area

Flooring & Screed

Floors everything stands on.

Every covering is only as good as the build-up beneath it. We build floors from the insulation to the covering-ready surface, level, dry and on schedule.

What we deliver in flooring

Between the structural slab and the finished floor lie the layers you never see again but feel every day: insulation, screed, levelling. We build them so that coverings last and rooms stay quiet.

  • Screed works: Cement screed and flowing screed, conventional or on insulation, with controlled drying.
  • Impact sound insulation: Decoupled build-ups, so steps upstairs do not arrive downstairs.
  • Levelling: Levelling compounds for old floorboards, sloping slabs and transitions.
  • Dry screed: For existing buildings and schedules where wet systems are out of the question.
  • Covering preparation: Covering-ready surfaces for parquet, vinyl, tile or carpet, including moisture measurement.
  • Floor coverings: Installation through our established partners, coordinated and jointly accepted.
Craftsman levelling fresh screed across a large area
Level means: measurably level

The process

From first call to handover.

01

Measurement & build-up advice

We measure the space and clarify heights, loads and the right build-up.

02

Binding offer

An offer with a clear layer build-up and a binding schedule including drying times.

03

Installation

Insulation, screed, levelling: cleanly installed, with documented measurements.

04

Covering readiness & handover

Moisture measurement, protocol and handover to the covering or the finished surface.

FAQ

Frequently asked questions

How long does screed need to dry?

That varies by system and layer thickness. The drying time is part of our schedule, and coverings only go down after measured readiness.

Can you level old, sloping floors?

Yes, with levelling compounds or dry screed we get old floorboards and uneven slabs level too.

Do you install the floor coverings yourselves?

The installation is done by our established partners. Coordination, scheduling and acceptance run through us, you have one point of contact.

What about underfloor heating?

We install heating screed on underfloor heating, and coordinate the heating installation with the specialist company.

The next step

Let's talk about your project.

Start your project info@bat-ausbau.de